2 speeds stay put cross rods rotating head position limit switch for controlling overhead crane electric movement

XCRE18 | Telemecanique Sensors

b'XCRF17 Metallic Limit Switch, Product Environmental Profile (pdf) 11/1/2017: 281.4kB: REACh Declaration Date Size; XCRE18 : limit switch XCR - metal stay put crossed rods lever square rod 6mm - 2X(1NC+NO) (pdf) 6/16/2021: 195.3kB'

Physics Help | Chegg.com

b'Chegg is one of the leading providers of physics help for college and high school students. Get help and expert answers to your toughest physics questions. Master your physics assignments with our step-by-step physics textbook solutions. Ask any physics question and \xe2\x80\xa6'

DMK SERIES - donaticranes.com

b'3.2 or 4 m/min 2 fall for 2 chain fall hoists TWO LIFTING SPEEDS Created with pole changing motor: 4/1.2, 6.3/2.1 or 8/2.5 m/min for 1 chain fall hoists 2.5/0.8 or 3.2/1 m/min. for 2 chain fall hoists STANDARD HOOK PATH: up to 12 m over 12 m upon request PROTECTION AND INSULATION OF ELECTRICAL PARTS Self-braking In the lifting and travelling ...'

Overhead crane terminology | Konecranes

b'SWITCH, LIMIT: A device that is actuated by the motion of a part of a power-driven machine or equipment to alter or disconnect the electric, hydraulic, or pneumatic circuit associated with the machine or equipment. switch, main (crane disconnect): a switch on the crane controlling the main power supply from the runway conductors.'

Six dangerous misconceptions about crane safety

b"Jul 10, 2003 \xc2\xb7 Pulling at a 45-degree angle would put equal lateral and vertical stresses on the crane, possibly causing bridge beam failure, even with a pick that's only half of the rated capacity. Upper Limit Switch. Misconception. When I lift, I need all the height I can get, so I must lift until I hit the upper limit switch\xe2\x80\xa6"

Crane - Load Calculation Template

b'Crane Configuration \xe2\x80\x93 Radius: 12m \xe2\x80\x93 Boom length: 32.4m (Crane can lift 4.5 tons) Crane Utilisation Load 4t x 100 \xc3\xb7 4.5 = 88.8% Crane Utilization too high for hazardous area (Chemical Plant) You would need to Reduce Boom Length or Reduce Crane Radius Load 4t (@10m) x 100 \xc3\xb7 5t = 80.0% Crane \xe2\x80\xa6'

DMK SERIES - donaticranes.com

b'3.2 or 4 m/min 2 fall for 2 chain fall hoists TWO LIFTING SPEEDS Created with pole changing motor: 4/1.2, 6.3/2.1 or 8/2.5 m/min for 1 chain fall hoists 2.5/0.8 or 3.2/1 m/min. for 2 chain fall hoists STANDARD HOOK PATH: up to 12 m over 12 m upon request PROTECTION AND INSULATION OF ELECTRICAL PARTS Self-braking In the lifting and travelling ...'

AMERICAN NATIONAL STANDARD SAFETY CODE FOR CRANES ...

b'A pin connecting the mast cap to the mast allowing rotation of the mast. 6-0.2.2.14 Guy. A rope used to steady or secure the mast or other member in the desired position. 6-0.2.2.15 Load, Working. The external load, in pounds, applied to the derrick, including the weight of load attaching equipment such as load blocks, shackles and slings.'