Convenient installation new design double girder bridge crane with hoist

Crane Girder Design

b'Mar 01, 2018 \xc2\xb7 Crane Girder Design Crane Girder Details Proper detailing is the key to good fatigue performance The vast majority of crane girder performance issues occur at the crane girder to column connection. 3 4 Column or Bracket Support \xe2\x80\xa2 Do not use framed or clip angle type connections. \xe2\x80\xa2 Extend'

Warehouse Double Girder Overhead Crane - Aicrane Overhead ...

b'Different types of warehouse double girder overhead cranes. Aimed at various kinds of warehouse, like single floor or multi ground, we can design and produce the certain warehouse overhead crane for sale. Considering to diverse cargo that need to lift or move in warehouse, we mainly custom and produce three'

1910.179 - Overhead and gantry cranes. | Occupational ...

b'New and existing equipment. All new overhead and gantry cranes constructed and installed on or after August 31, 1971, shall meet the design specifications of the American National Standard Safety Code for Overhead and Gantry Cranes, ANSI B30.2.0-1967, which is \xe2\x80\xa6'

20 Ton Bridge Crane - Overhead Bridge Crane Manufacturer

b'The double girder hoist overhead crane has compact structure, low headroom, light weight and small wheel pressure. Double Girder Bridge Crane. AQ-LH double girder 20 ton cranes parameters: Lifting Capacity: 5~32t. Span Length: 10.5~31.5m. Lifting Height: 6~18m. Lifting Speed: 3~8m/min. Crane Travelling Speed: 20m/min.'

Double girder gantry crane - SEVENCRANE

b'The rails of double girder gantry cranes are installed on the ground, and the main beam is supported by the legs. The rails of the bridge crane are installed on the column without the legs. It is the biggest difference between the double girder bridge cranes and double girder gantry cranes.'

CRANE, RUNWAY AND MONORAIL SYSTEM INSTALLATION

b'New Installations When a new system is installed into a new building or a new addition to an old building, the entire system must be re-inspected after 30 to 60 days. As the building settles, alignment of the monorails may change and may require realignment. All hangers and splice bolts need to'

Makeover for two overhead travelling cranes | Demagcranes

b'Dec 15, 2015 \xc2\xb7 Previously, an additional hoist unit had travelled along the outer edge of the crane girder on a cantilever crab. This arrangement offers the advantage of also reaching the edges of the workshop with the crane hook. The installation of a new cantilever crab of compact design with a Demag 6.3 t rope'

China Double Girder Workshop Overhead Crane with Demag ...

b'SZMC is founded in 1989, is the predecessor of Xintai City crane factory, restructuring in 2005.Over the years the company continued to introduce domestic and foreign advanced production technology, absorb the specialized, high-quality professionals, the company strong technical force, advanced process , ,'